Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/plugins/revslider/includes/operations.class.php on line 2758

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/plugins/revslider/includes/operations.class.php on line 2762

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/plugins/revslider/includes/output.class.php on line 3684

Warning: file_exists(): open_basedir restriction in effect. File(/includes/) is not within the allowed path(s): (/data/web/virtuals/153178/virtual) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/themes/smart/engine/components/php-file-manager/component.php on line 86

Warning: file_exists(): open_basedir restriction in effect. File(/includes/custom-post-types/) is not within the allowed path(s): (/data/web/virtuals/153178/virtual) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/themes/smart/engine/components/php-file-manager/component.php on line 86

Warning: file_exists(): open_basedir restriction in effect. File(/engine/admin/classes/) is not within the allowed path(s): (/data/web/virtuals/153178/virtual) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/themes/smart/engine/components/php-file-manager/component.php on line 86

Warning: file_exists(): open_basedir restriction in effect. File(/engine/admin/) is not within the allowed path(s): (/data/web/virtuals/153178/virtual) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/themes/smart/engine/components/php-file-manager/component.php on line 86

Warning: file_exists(): open_basedir restriction in effect. File(/engine/theming/) is not within the allowed path(s): (/data/web/virtuals/153178/virtual) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/themes/smart/engine/components/php-file-manager/component.php on line 86

Warning: file_exists(): open_basedir restriction in effect. File(/compatibility.php) is not within the allowed path(s): (/data/web/virtuals/153178/virtual) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/themes/smart/engine/components/php-file-manager/component.php on line 86

Warning: Cannot modify header information - headers already sent by (output started at /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-content/plugins/revslider/includes/operations.class.php:2758) in /data/web/virtuals/153178/virtual/www/domains/ebec.cz/wp-includes/feed-rss2.php on line 8
Finále – EBEC https://ebec.cz Mon, 12 Feb 2018 21:23:33 +0000 en-US hourly 1 https://wordpress.org/?v=6.4.8 https://ebec.cz/wp-content/uploads/2017/12/cropped-Artboard-3-32x32.png Finále – EBEC https://ebec.cz 32 32 CITY PARK CHALLENGE https://ebec.cz/portfolio-project/1474/?utm_source=rss&utm_medium=rss&utm_campaign=1474 https://ebec.cz/portfolio-project/1474/#respond Mon, 12 Feb 2018 20:35:46 +0000 https://ebec.cz/?post_type=portfolio_project&p=1474

CITY PARK CHALLENGE  EBEC Brno 2016, FINAL 

INTRODUCTION

Imagine it’s a year 1849. Electrification is just a crazy idea of a few pioneers in a field of electric energy. You have escaped from Europe to the ‘New’ continent to find better life. As so, you have bought a piece of land and built a dock there. The ships are going in and o and you are slowly going out of workers. The load is becoming bigger and heavier so the only thing that can save your dock is a new machine. The magic machine built of the materials that are not expensive and you can obtain a lot of them. Wood and water. Your task is to make a hydraulic crane.

TASK

  • –  Make a hydraulic arm (crane) out of given materials to lift cans. You will receive 4 cans which you should place one on each other to make a pyramid with 3 cans as a base and one as a top.
  • –  The crane can be controlled by syringes only. No hand hold or other way of controlling the functions of the crane.
  • –  Any other constructions than the crane is forbidden
  • –  Keep in mind, that the arm should be able to operate in all directions(left/right, up/down, forwards/backwards)
  • –  The cans will be at any place up to 30 centimeters from the arm base-desk
  • –  Screws can be used to attach the construction to the ‘mother’ board only.
CLASSIFICATION

100 points in total

BEST classification

  • –  Arm construction
  • –  Design and quality – Creativity
  • – Final task + impression

Jury classification

  • –  Fastest time 1st / 2nd / 3rd
  • –  Full pyramid construction – Noleaks
  • –  No can falls
  • –  Crane (arm) will broke down

]]>
https://ebec.cz/portfolio-project/1474/feed/ 0
Koncept Evakuačního Tábora https://ebec.cz/portfolio-project/koncept-evakuacniho-tabora/?utm_source=rss&utm_medium=rss&utm_campaign=koncept-evakuacniho-tabora https://ebec.cz/portfolio-project/koncept-evakuacniho-tabora/#respond Mon, 12 Feb 2018 18:54:01 +0000 https://ebec.cz/?post_type=portfolio_project&p=1471

EBEC Brno 2017, CASE STUDY SP Challenge

Koncept evakuačního tábora

 

Scénář: Republika Haiti nacházející se na ostrově Hispaniola je jedna z nejchudších zemí světa, která je sužována mnoha problémy. Mezi ně patří časté hurikány, povodně a zemětřesení, které způsobují velké ztráty na životech a připravují o domov mnoho lidí. Dopady přírodních katastrof je možné zmírnit, bude-li k dispozici unifikovaný postup k řešení krizových situací, který bude zahrnovat vybudování dočasného přístřeší pro oběti katastrof a nezbytného zázemí potřebné pro postižené po dobu nezbytnou pro obnovu infrastruktury postižené lokality.ZadáníCílem je návrh evakuačního tábora pro případ náhlé přírodní katastrofy. Materiál pro jeho postavení a vybavení musí být přepraven spolu s lidmi nutnými pro jeho stavbu a základní obsluhu tábora na místo čtyřmi letadly typu C-130H Hercules. Přistávání letadel a vykládání materiálu z letadla není v tomto zadání nutné řešit. Tento tábor musí být postavitelný do 36 hodin a dále musí být energeticky soběstačný. Při návrhu uvažujte nad rozměry ubytovacích jednotek a potřebného zázemí. Berte v potaz, že všechny komponenty by měly být snadno přepravitelné na místě určení s využitím pozemní armádní techniky.Lokalita pro umístění tábora bude na okraji města Jeremie, které se nachází na západě země (viz. mapa). Toto město patřilo po zemětřesení v roce 2010 k nejpostiženějším místům a vyznačuje se následujícími podmínkami:

  •  Populace 31 000 osob
  •  Srážky až 2000 mm\rok
  •  Teploty mezi 20-30°C
  •  Velké množství srážek a podmáčený terén

Vzhledem k místním podmínkám musíte klást důraz na následující věci – kvůli podmáčenému terénu nesmí být konstrukce budov příliš těžké. V těchto podmínkách se také snadno šíří nemoci. Vymyslete proto způsob, jak bránit jejich šíření.Tábor samotný musí pro své obyvatele zajišťovat minimálně ubytování, zdravotní péči, stravování a hygienu. Je nutné počítat s možnými problémy se zásobováním proto tábor musí vydržet alespoň po dobu tří dnů s vlastními zásobami potravin a základních potřeb. Soutěžící by měli také vyřešit otázku zásobování tábora pitnou vodou.Pokuste se uvažovat nad následnou využitelností tábora v jiných klimatických podmínkách.B oard of E uropean St udents of T echnology
B E S T Brno Web: BEST.vutbr.cz | www.BEST.eu.org Údolní 53 E-mail: brno@BEST.eu.org
602 00 Brno
Czech Republic

Co musí být splněno:

  •  Rozměry a hmotnost vybavení musí odpovídat kapacitě letadel.
  • Tábor musí být postavitelný a plně funkční do 36 hodin.
  • Tábor musí být energeticky soběstačný a musí mít zajištěné dodávky pitné vody.
  • Jednotlivé části musí být snadno přepravitelné.
  • Tábor musí zajišťovat ubytování, zdravotní péči, hygienu, stravu a pitnou vodu alespoň pro 4000 lidí.
  •  Tábor by měl být použitelný i v jiných klimatických.
  • Tábor by měl být odolný proti vlhku, horku a ideálně i proti zemětřesení.Jako bonus můžete do hloubky rozvést libovolné kritérium.Výstup:Vaším výstupem bude prezentace ve formátu .pdf

Hodnocení (120b)

  1. Komplexnost návrhu tábora a jeho jednotlivých částí (obytné, zdravotní…)
  2. Řešení energetické soběstačnosti a dodávek vody
  3. Rychlost stavby, náročnost obsluhy, realizovatelnost
  4. Využitelnost koncepce tábora v jiných podmínkách
  5. Kvalita a dojem z prezentace
  6. Zpracování a osobní hodnocení porotce
  7. BONUS – detailnější rozpracování některého z kritérií v bodech 1 až 4.

Vítězná prezentace

Case Study HRW final

 

 

 

]]>
https://ebec.cz/portfolio-project/koncept-evakuacniho-tabora/feed/ 0